A platform for research: civil engineering, architecture and urbanism
Under water cutting, by explosive methods, of timber piles at bridge over Maribyrnong River
Piles were double cleated at 15 ft below silt level; since stream is navigable waterway, it was necessary to demolish piles cleanly at silt level, average length of pile to be removed being 16 ft; girdle method for explosive work was, therefore, adopted; arrangement of placing explosive charge shown in drawing.
Under water cutting, by explosive methods, of timber piles at bridge over Maribyrnong River
Piles were double cleated at 15 ft below silt level; since stream is navigable waterway, it was necessary to demolish piles cleanly at silt level, average length of pile to be removed being 16 ft; girdle method for explosive work was, therefore, adopted; arrangement of placing explosive charge shown in drawing.
Under water cutting, by explosive methods, of timber piles at bridge over Maribyrnong River
Instn Engrs Australia -- J
Wright, W.G. (author)
1942
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Effects of Pull-Over on Timber Bridge Falsework Piles
NTIS | 1987
|Timber bridge over Kiskatinaw River
Engineering Index Backfile | 1944
Bridge Timber Piles Load Rating under Eccentric Loading Conditions
British Library Online Contents | 2012
|Experimental and analytical investigation of bridge timber piles under eccentric loads
Online Contents | 2010
|