A platform for research: civil engineering, architecture and urbanism
Two-pipe pile jetting rig speeds driving on navy pier job
New pier being built at important navy yard requires some 2000 concrete piles, which are being put down with minimum of driving effort by using two jets, one on either side of pile, and each combining high pressure water and air. (see also Concrete and Constr Eng v 37 n 10 Oct 1942 p 384)
Two-pipe pile jetting rig speeds driving on navy pier job
New pier being built at important navy yard requires some 2000 concrete piles, which are being put down with minimum of driving effort by using two jets, one on either side of pile, and each combining high pressure water and air. (see also Concrete and Constr Eng v 37 n 10 Oct 1942 p 384)
Two-pipe pile jetting rig speeds driving on navy pier job
Eng News-Rec
Engineering News-Record ; 128
1942
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Two-pipe pile jetting rig speeds driving on navy pier job
Engineering Index Backfile | 1942
Jetting-Assisted Sheet Pile Driving
British Library Conference Proceedings | 2002
|Case Study of Navy Pier Pile Foundation Installation
British Library Conference Proceedings | 1994
|European Patent Office | 2019
|