A platform for research: civil engineering, architecture and urbanism
Latest type piling structure for Gulf Coast marine drilling
Structure designed for uniform load distribution by employing improved method of bracing and scabbing piling; details of method of scabbing used in each pile; bracing, capping, I-beam loading, etc; lower deck of structure is used for heavier equipment such as boilers, mud tanks, etc; upper deck for pipe rack and mud house; special features.
Latest type piling structure for Gulf Coast marine drilling
Structure designed for uniform load distribution by employing improved method of bracing and scabbing piling; details of method of scabbing used in each pile; bracing, capping, I-beam loading, etc; lower deck of structure is used for heavier equipment such as boilers, mud tanks, etc; upper deck for pipe rack and mud house; special features.
Latest type piling structure for Gulf Coast marine drilling
Petroleum Engr
Pryor, C.C. (author)
Petroleum Engineer ; 13
1942
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Marine borers attack piling along Atlantic coast
Engineering Index Backfile | 1922
New platform has slanted piling for deepest gulf drilling
Engineering Index Backfile | 1956
Piling substructure for open-water drilling location in Gulf
Engineering Index Backfile | 1941
|Jacket-type piling structures, speed marsh drilling
Engineering Index Backfile | 1950
|