A platform for research: civil engineering, architecture and urbanism
By extension of Boulevard upstream along Kanawha River at Charleston, W Va, two dangerous grade crossings have been eliminated on U S Highway 60; on new route, 18-ft wide bituminous surfaced roadway on crooked alignment is replaced by two 22-ft roadways separated by 3-ft wide wall; for new highway, earth and rock embankment was placed along river bank with rock toe wall built up to 2 ft above normal pool level.
By extension of Boulevard upstream along Kanawha River at Charleston, W Va, two dangerous grade crossings have been eliminated on U S Highway 60; on new route, 18-ft wide bituminous surfaced roadway on crooked alignment is replaced by two 22-ft roadways separated by 3-ft wide wall; for new highway, earth and rock embankment was placed along river bank with rock toe wall built up to 2 ft above normal pool level.
Kanawha Boulevard at Charleston extended
Eng News-Rec
Brewster, W. (author)
Engineering News-Record ; 127
1941
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Riverfront Boulevard for Charleston
Engineering Index Backfile | 1941
|Lockwood Boulevard Extension - Charleston County
NTIS | 1971
Engineering Index Backfile | 1889
Vom Boulevard Périphérique zum Boulevard Central?
Taylor & Francis Verlag | 2017
|Concrete for Kanawha river project
Engineering Index Backfile | 1938
|