A platform for research: civil engineering, architecture and urbanism
As result of serious and repeated flooding in several areas in town, County Borough Council decided to construct storm overflow chamber; details of construction illustrated and described.
As result of serious and repeated flooding in several areas in town, County Borough Council decided to construct storm overflow chamber; details of construction illustrated and described.
East Newport main drainage scheme
Instn Mun County Engrs -- J
Cobbett, C. (author)
1942
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Workington main drainage scheme
Engineering Index Backfile | 1954
|Engineering Index Backfile | 1947
|Blackpool main drainage scheme
Engineering Index Backfile | 1940
|Rimrose Brook main drainage scheme
Engineering Index Backfile | 1947
Ilford main drainage scheme-culverting brook
Engineering Index Backfile | 1956
|