A platform for research: civil engineering, architecture and urbanism
Concrete caissons for core wall of dam
Description of construction work being carried out on Merriman Dam. Indexed in Engineering Index 1941 p 303, from Eng News-Rec Sept 25 1941.
Concrete caissons for core wall of dam
Description of construction work being carried out on Merriman Dam. Indexed in Engineering Index 1941 p 303, from Eng News-Rec Sept 25 1941.
Concrete caissons for core wall of dam
Concrete Constr Eng
1942
5 pages
Supp plate
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pneumatic caissons sunk for core wall of Quabbin dam
Engineering Index Backfile | 1936
Concrete caissons and long spans
Engineering Index Backfile | 1953
|Prestressed concrete caissons at brest
Engineering Index Backfile | 1949
Concrete caissons for breakwater construction
Engineering Index Backfile | 1920
|Reinforced concrete caissons with bottoms
Engineering Index Backfile | 1927
|