A platform for research: civil engineering, architecture and urbanism
Cutoff wall of sand-asphalt mix was used at Claytor hydroelectric project near Radford, Va, to stop underflow through north abutment of dam; sheeted trench was sunk through over burden to rock, and, after all solution channels had been cleaned out, trench and all rock channels were filled with hot sand-asphalt mix to above reservoir level. (See also - n 23 (discussion) June 4 p 900)
Cutoff wall of sand-asphalt mix was used at Claytor hydroelectric project near Radford, Va, to stop underflow through north abutment of dam; sheeted trench was sunk through over burden to rock, and, after all solution channels had been cleaned out, trench and all rock channels were filled with hot sand-asphalt mix to above reservoir level. (See also - n 23 (discussion) June 4 p 900)
Asphalt cutoff wall at Claytor dam
Eng News-Rec
Slocum, H.S. (author)
Engineering News-Record ; 128
1942
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.