A platform for research: civil engineering, architecture and urbanism
Description of main dam of irrigation project in Argentina; dam takes form of sloping reinforced concrete slab supported by counterforts, it is 117 m long at crest with max height of 36 m above top of foundation; design based on that of Stony Gorge dam built in 1930 by U S Bureau of Reclamation. From Ingenieria July 1941.
Description of main dam of irrigation project in Argentina; dam takes form of sloping reinforced concrete slab supported by counterforts, it is 117 m long at crest with max height of 36 m above top of foundation; design based on that of Stony Gorge dam built in 1930 by U S Bureau of Reclamation. From Ingenieria July 1941.
Dam at Cruz De Piedra, Argentine
Civ Eng (Lond)
Volpi, C.A. (author)
1942
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Stratigraphy, a key control in the geotechnical foundation zoning of Casa de Piedra Dam, Argentine
British Library Conference Proceedings | 1998
|