A platform for research: civil engineering, architecture and urbanism
During design of zoned earth and rock fill dams it is usually necessary to make several solutions involving assumed ratios of separation of material with which structure is to be built; chart is given which shows graphically amount of excavation and fill produced in 2 specific cases involving solid rock borrow and cobble, earth borrow.
During design of zoned earth and rock fill dams it is usually necessary to make several solutions involving assumed ratios of separation of material with which structure is to be built; chart is given which shows graphically amount of excavation and fill produced in 2 specific cases involving solid rock borrow and cobble, earth borrow.
Solving quantities in excavation and fill
Eng News-Rec
Powell, B.F. (author)
Engineering News-Record ; 129
1942
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Excavation and fill ordnance protects public
Engineering Index Backfile | 1954
|Heavy excavation furnished material for rock-fill dam
Engineering Index Backfile | 1934
|Cableways handle excavation and fill on Wisconsin Dam
Engineering Index Backfile | 1924
Excavation construction method for dredger fill fluid sludge roadbed
European Patent Office | 2022
|