Complete plans for forms and their erection and careful attention to details enable 100 carpenters to prepare column and deck forms for average of 25,000 sq ft of concrete slab daily on multi-story housing project; plywood is used for all forms with each piece detailed for particular location; long boom cranes with gooseneck jibs place concrete to roof over thirteenth floor without use of runways and buggies.
Planned formwork speeds construction
Complete plans for forms and their erection and careful attention to details enable 100 carpenters to prepare column and deck forms for average of 25,000 sq ft of concrete slab daily on multi-story housing project; plywood is used for all forms with each piece detailed for particular location; long boom cranes with gooseneck jibs place concrete to roof over thirteenth floor without use of runways and buggies.
Planned formwork speeds construction
Eng News-Rec
Engineering News-Record ; 129
1942
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New sliding formwork system speeds headframe
Engineering Index Backfile | 1960
|FORMWORK & FALSEWORK - Formwork speeds up - TGV line between-Antwerp and Rotterdam
Online Contents | 2003
Formwork support of outrigger construction formwork, construction formwork and construction method
European Patent Office | 2024
|FORMWORK AND FALSEWORK - Parapet bracket speeds construction of major new motorway junction
Online Contents | 2005
|