A platform for research: civil engineering, architecture and urbanism
War-front type barracks built in record time
Construction methods for military barracks discussed; one type, so-called "theater of operations" design, is single story tar paper covered structure reminiscent of last war; another, planned for even more rapid construction, is of prefabricated demountable type; of panel makeup, assembled with bolts, log screws and shear connectors.
War-front type barracks built in record time
Construction methods for military barracks discussed; one type, so-called "theater of operations" design, is single story tar paper covered structure reminiscent of last war; another, planned for even more rapid construction, is of prefabricated demountable type; of panel makeup, assembled with bolts, log screws and shear connectors.
War-front type barracks built in record time
Eng News-Rec
Engineering News-Record ; 129
1942
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1919
|British Library Online Contents | 1992