A platform for research: civil engineering, architecture and urbanism
False bents formed of suspended span during erection of pit river bridge
Structural steel members from cantilever section set on concrete foundations for use as falsework during early stages of construction of combination highway and railroad bridge forming part of relocations made necessary by filling Shasta Reservoir of Central Valley Project.
False bents formed of suspended span during erection of pit river bridge
Structural steel members from cantilever section set on concrete foundations for use as falsework during early stages of construction of combination highway and railroad bridge forming part of relocations made necessary by filling Shasta Reservoir of Central Valley Project.
False bents formed of suspended span during erection of pit river bridge
Western Construction News
Leonard, S.S. (author)
1942
10 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Erection of Quebec bridge suspended span
Engineering Index Backfile | 1916
|Bridge span collapses during erection
Engineering Index Backfile | 1927
The erection of the suspended span new Quebec bridge
Engineering Index Backfile | 1916
|Erection of the suspended span of the Quebec bridge
Engineering Index Backfile | 1917
Bents pivoted on bottom pins permit easy erection of girder bridge
Engineering Index Backfile | 1949
|