A platform for research: civil engineering, architecture and urbanism
Long girder span bridge collapses during erection
Account of failure of bridge under construction at Hartford, Conn; two 96-ft girders had already been cantilevered out from falsework bent and traveler was about 85 ft out when accident occurred; suggestion made that movement of river bottom may have shifted piling; illustrations and additional construction details given which may support theory.
Long girder span bridge collapses during erection
Account of failure of bridge under construction at Hartford, Conn; two 96-ft girders had already been cantilevered out from falsework bent and traveler was about 85 ft out when accident occurred; suggestion made that movement of river bottom may have shifted piling; illustrations and additional construction details given which may support theory.
Long girder span bridge collapses during erection
Eng Contract Rec
1942
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge span collapses during erection
Engineering Index Backfile | 1927
DUAL-MODE BRIDGE GIRDER ERECTION MACHINE AND VARIABLE-SPAN GIRDER ERECTION METHOD
European Patent Office | 2023
|Double-span bridge girder erection machine and bridge erection construction method thereof
European Patent Office | 2023
|BRIDGE GIRDER ERECTION METHOD FOR MULTIPLE SPAN CONTINUOUS BRIDGE
European Patent Office | 2018
|European Patent Office | 2024
|