A platform for research: civil engineering, architecture and urbanism
Plans for control of river floods, providing for floodway 5 mi wide to divert waters from river at flood stage, required construction of bridges and trestles 3 1/2 mi long on highway and railroads crossing floodway; construction of high level crossings authorized; investigations and tests were made to determine type of bridge; criticism of current specification for distribution of pile load.
Plans for control of river floods, providing for floodway 5 mi wide to divert waters from river at flood stage, required construction of bridges and trestles 3 1/2 mi long on highway and railroads crossing floodway; construction of high level crossings authorized; investigations and tests were made to determine type of bridge; criticism of current specification for distribution of pile load.
Pile test point to limitations of current specifications for bearing power
Am Ry Eng Assn -- Bul
Owen, R. (author)
1942
4 pages
5 Supp sheets
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Performance Specifications for Durable Concrete - Current practice and limitations
Online Contents | 2006
|Pile-treating specifications for using metallic salts
Engineering Index Backfile | 1935
Pile-wall combined bearing loading test device and test method
European Patent Office | 2024
|Concrete energy pile group pile-bearing platform foundation centrifuge test model and method
European Patent Office | 2023
|