A platform for research: civil engineering, architecture and urbanism
Project consists of concrete power house, spillway flanked by 9 mi of earth dams and dikes; powerhouse contains four Kaplan propellor turbines of 7200 hp each under 42 ft head, with generators rated at 6250 kva, 0.8 power factor, three-phase 60 cycle; earth dam from 40 to 58 ft high; foundation for entire project consists of deep bed of medium grained sand. (Separate)
Project consists of concrete power house, spillway flanked by 9 mi of earth dams and dikes; powerhouse contains four Kaplan propellor turbines of 7200 hp each under 42 ft head, with generators rated at 6250 kva, 0.8 power factor, three-phase 60 cycle; earth dam from 40 to 58 ft high; foundation for entire project consists of deep bed of medium grained sand. (Separate)
Petenwell hydroelectric project
Am Soc Civ Engrs -- Proc
Fucik, E.M. (author)
1951
15 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1961
|Engineering Index Backfile | 1955
|ASCE | 2021
|Vishnuprayag hydroelectric project
British Library Online Contents | 1997
|Tazimina Hydroelectric Project
British Library Conference Proceedings | 1997
|