A platform for research: civil engineering, architecture and urbanism
Ontario's biggest power project
Main features of 600,000-hp Sir Adam Beck-Niagara generating station No. 2 to be built adjacent to existing No. 1 station; development involves construction of station with six 75,000-kw (100-000-hp) units, pressure tunnel 5 mi long and open cut canal 2 1/2 mi long; construction problems involved.
Ontario's biggest power project
Main features of 600,000-hp Sir Adam Beck-Niagara generating station No. 2 to be built adjacent to existing No. 1 station; development involves construction of station with six 75,000-kw (100-000-hp) units, pressure tunnel 5 mi long and open cut canal 2 1/2 mi long; construction problems involved.
Ontario's biggest power project
Modern Power Eng
1951
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 1995
|Performance of Ontario's First Major Rehabilitation and Overlay Project
British Library Conference Proceedings | 1993
|CHALLENGES FACING ONTARIO'S INFRASTRUCTURE
British Library Conference Proceedings | 2005
|British Library Online Contents | 2003
|World's biggest signalling project
IuD Bahn | 2004
|