A platform for research: civil engineering, architecture and urbanism
Aggregate for concrete at pine flat
Dam of concrete gravity type, 440 ft high requires 2,150,000 cu yd of concrete; schedule calls for placing 3000 cu yd of concrete per day; organization of aggregate production; materials handling equipment described.
Aggregate for concrete at pine flat
Dam of concrete gravity type, 440 ft high requires 2,150,000 cu yd of concrete; schedule calls for placing 3000 cu yd of concrete per day; organization of aggregate production; materials handling equipment described.
Aggregate for concrete at pine flat
Western Construction
Western Construction ; 26
1951
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Seismic Analysis of Pine Flat Concrete Dam
TIBKAT | 2021
|Seismic Analysis of Pine Flat Concrete Dam
Springer Verlag | 2020
|Seismic Analysis of Pine Flat Concrete Dam
TIBKAT | 2021
|Seismic Analysis of Pine Flat Concrete Dam
TIBKAT | 2021
|Seismic Analysis of Pine Flat Concrete Dam
Springer Verlag | 2020
|