A platform for research: civil engineering, architecture and urbanism
Winter concreting, intrusion method combined on barge canal lock repair
Concrete walls in locks of N Y State Barge Canal repaired by removing 6 to 12 in. of concrete, placing reinforcement bars, plywood form units and aggregates; finally, special mortar is pumped into aggregate voids; protective measures against cold described.
Winter concreting, intrusion method combined on barge canal lock repair
Concrete walls in locks of N Y State Barge Canal repaired by removing 6 to 12 in. of concrete, placing reinforcement bars, plywood form units and aggregates; finally, special mortar is pumped into aggregate voids; protective measures against cold described.
Winter concreting, intrusion method combined on barge canal lock repair
Eng News-Rec
Engineering News-Record ; 146
1951
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
|Springer Verlag | 1986
Engineering Index Backfile | 1936
Engineering Index Backfile | 1965
|