A platform for research: civil engineering, architecture and urbanism
Upper and Lower seams separated by shale split ranging with some of worst roof in Utah; 6-ft long bolts were installed about 4 ft apart in both directions and timber cross-bars added; 4000 ft of entry, 750 ft of cross cuts and 1300 ft of room work has been bolted; saving of approximately 550,000 lin ft of timber per year.
Upper and Lower seams separated by shale split ranging with some of worst roof in Utah; 6-ft long bolts were installed about 4 ft apart in both directions and timber cross-bars added; 4000 ft of entry, 750 ft of cross cuts and 1300 ft of room work has been bolted; saving of approximately 550,000 lin ft of timber per year.
Roof-bolting at Sunnyside
Coal Age
Peperakis, J. (author)
Coal Age ; 55
1950
4 pages
Illustrations
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1953
|Engineering Index Backfile | 1952
|Engineering Index Backfile | 1951
|Engineering Index Backfile | 1950
|Engineering Index Backfile | 1957
|