Reconstruction at maypole colliery
Work to develop deeper seams began in 1938; shaft sinking completed within 2 yr, followed by construction of insets at Haigh Yard and Arley levels and by driving of tunnels to develop main area of Arley as first objective; pit winding arrangements, transport, erection of 250-hp electric hoisting engine at new position; 4 stages of survey of Hartley's tunnel. Before Manchester Geological and Min Soc.
Reconstruction at maypole colliery
Work to develop deeper seams began in 1938; shaft sinking completed within 2 yr, followed by construction of insets at Haigh Yard and Arley levels and by driving of tunnels to develop main area of Arley as first objective; pit winding arrangements, transport, erection of 250-hp electric hoisting engine at new position; 4 stages of survey of Hartley's tunnel. Before Manchester Geological and Min Soc.
Reconstruction at maypole colliery
Colliery Guardian
Edmond, F. (author) / Bennett, A.H. (author)
Colliery Guardian ; 182
1951
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Multi-Robotic Maypole Braiding
TIBKAT | 2024
|Civil engineering and colliery reconstruction
Engineering Index Backfile | 1960
|Bentinck colliery of new Hucknall Colliery Co, Ltd
Engineering Index Backfile | 1934
Engineering Index Backfile | 1955
|Engineering Index Backfile | 1940
|