A platform for research: civil engineering, architecture and urbanism
Illustrated description of repair of 70-ft span prefabricated timber Paul bridge in Walla Walla County, Wash; abutment moving toward stream was held in position by vertical and batter piles and mass concrete; work was finished in 30 days; costs amounted to $ 7000.
Illustrated description of repair of 70-ft span prefabricated timber Paul bridge in Walla Walla County, Wash; abutment moving toward stream was held in position by vertical and batter piles and mass concrete; work was finished in 30 days; costs amounted to $ 7000.
Economical bridge repair job
Better Roads
Smith, B.L. (author)
Better Roads ; 21
1951
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Economical Steel Bridge Design
British Library Conference Proceedings | 1997
|Sorok Bridge - Standard for an Economical Suspension Bridge
British Library Online Contents | 2012
|Sorok Bridge-Standard for an Economical Suspension Bridge
Online Contents | 2012
|Economical Aspects of Repair and Maintenance
British Library Conference Proceedings | 1998
|Economical and Functional Steel Bridge Details
British Library Conference Proceedings | 1993
|