A platform for research: civil engineering, architecture and urbanism
Large impounding reservoir holds equivalent of 3 years' consumption; 80foot dam provides power for dumping and other purposes; upward hydrostatic thrust on dam eliminated; many unusual features in design; provision for studying rainfall, run-off, evaporation and silting of reservoir.
Large impounding reservoir holds equivalent of 3 years' consumption; 80foot dam provides power for dumping and other purposes; upward hydrostatic thrust on dam eliminated; many unusual features in design; provision for studying rainfall, run-off, evaporation and silting of reservoir.
Durham's new water works
Pub. Wks
Williams, D.M. (author)
Public Works ; 58
1927
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Durham's new dyehouse and steam plant
Engineering Index Backfile | 1921
|British Library Conference Proceedings | 2006
|