A platform for research: civil engineering, architecture and urbanism
Revamping the water-supply system of the cities of Athens and Piraeus
Prize-winning project by Siemens-Bauunion to provide 100 liters per capita per day for estimated population of 1,174,910 in 1950, involves construction of dam, at Marathon, 53 m. high, 250 m. long; pressure tunnel, 15 km. long; 20 km. of aqueduct mains, 55 to 140 mm. in diameter; filters and chemical treatment works; distribution reservoirs and pipe system; contractors, Ulen and Co. of New York.
Revamping the water-supply system of the cities of Athens and Piraeus
Prize-winning project by Siemens-Bauunion to provide 100 liters per capita per day for estimated population of 1,174,910 in 1950, involves construction of dam, at Marathon, 53 m. high, 250 m. long; pressure tunnel, 15 km. long; 20 km. of aqueduct mains, 55 to 140 mm. in diameter; filters and chemical treatment works; distribution reservoirs and pipe system; contractors, Ulen and Co. of New York.
Revamping the water-supply system of the cities of Athens and Piraeus
Die Neugestaltung der Trinkwasserversorgung der Stadte Athen und Piraus
Eigenbrodt, H. (author)
Bautechnik ; 5
1927
4 pages
3 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
|The stone of Piraeus at the monuments of the Acropolis of Athens
British Library Conference Proceedings | 2000
|Representing the operation and evolution of ancient Piraeus’ water supply system
Springer Verlag | 2022
|