A platform for research: civil engineering, architecture and urbanism
Reconstruction of le day railway viaduct, Switzerland
Replacing old iron girder bridge, by masonry-arch structure; new bridge consists of one main span and two side spans, approaches remaining practically unchanged; three larger arches carry series of spandrel arches of between 3.57 and 4.50 m. span.
Reconstruction of le day railway viaduct, Switzerland
Replacing old iron girder bridge, by masonry-arch structure; new bridge consists of one main span and two side spans, approaches remaining practically unchanged; three larger arches carry series of spandrel arches of between 3.57 and 4.50 m. span.
Reconstruction of le day railway viaduct, Switzerland
Engineering
Engineering ; 124
1927
4 pages
13 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Wiesen viaduct on the Davosfilisur railway, Switzerland
Engineering Index Backfile | 1909
The Sitter Viaduct, Switzerland
Engineering Index Backfile | 1911
Rehabilitation of St. Ursanne Viaduct, Switzerland
British Library Online Contents | 2001
|Engineering Index Backfile | 1940