A platform for research: civil engineering, architecture and urbanism
Construction of tunnel more than seven miles long, containing two forty-five degree bends, without sinking shafts; stopping seepage of ground water; lining with concrete.
Construction of tunnel more than seven miles long, containing two forty-five degree bends, without sinking shafts; stopping seepage of ground water; lining with concrete.
Shepaug tunnel, Waterbury waterworks
Pub. Wks
Clapp, G.E. (author)
Public Works ; 58
1927
6 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The wigwam reservoir Masonry dam of the waterworks of Waterbury, Conn.
Engineering Index Backfile | 1903
|The Shepaug tunnel, Waterbury, Conn
Engineering Index Backfile | 1929
|Waterbury (Conn.) driving a long rock tunnel
Engineering Index Backfile | 1926
|Performance Evaluation of Waterbury Dam
British Library Conference Proceedings | 2002
|