A platform for research: civil engineering, architecture and urbanism
Design and methods of construction of recent extensions of sewerage system of industrial district of Essen; tunnels of egg-shape, circular and horseshoe sections, of about 5 sq. m. useful area, driven by mining methods; extreme congestion of district and inadequacy of natural stream necessitated construction of underground storage line, to take care of storm peaks for 12 minutes, of total capacity of 2000 cu. m.
Design and methods of construction of recent extensions of sewerage system of industrial district of Essen; tunnels of egg-shape, circular and horseshoe sections, of about 5 sq. m. useful area, driven by mining methods; extreme congestion of district and inadequacy of natural stream necessitated construction of underground storage line, to take care of storm peaks for 12 minutes, of total capacity of 2000 cu. m.
Remarkable sewerage work in a mining district
Bemerkenswerte Kanalisationsausfuhrungen im Bergbaugebiet
Nack (author)
Bautechnik ; 5
1927
4 pages
5 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1907
Sewerage in the Doncaster rural district
Engineering Index Backfile | 1916
|Sewerage in the doncaster rural district
Engineering Index Backfile | 1916
|Sewerage in the Boston Metropolitan District
Engineering Index Backfile | 1929
|Merrimack River valley sewerage district project
Engineering Index Backfile | 1948
|