A platform for research: civil engineering, architecture and urbanism
Details concerning Sacramento's combined sewer systems, in which both storm water and sanitary sewage are carried in same main sewers; precast reinforced concrete pipe, 78 to 108 in. in diameter, 19,050 ft long, now under construction.
Details concerning Sacramento's combined sewer systems, in which both storm water and sanitary sewage are carried in same main sewers; precast reinforced concrete pipe, 78 to 108 in. in diameter, 19,050 ft long, now under construction.
Sacramento constructing combined sewer
West. Constr. News
Schuyler, P. (author)
1927
3 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 2010
|British Library Conference Proceedings | 2007
|British Library Conference Proceedings | 2007
|Constructing Pasadena's outfall sewer
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1940
|