A platform for research: civil engineering, architecture and urbanism
Practice of Emscher Water District in lining sewers with concrete and layers of porous materials (gravel, slags); cross-section of drains is triangular or with rounded bottom and only lower half of wetted perimeter is lined; deals with settlement of canals due to coal mining. (See also - no. 28 June 24 1927 p 406-408)
Practice of Emscher Water District in lining sewers with concrete and layers of porous materials (gravel, slags); cross-section of drains is triangular or with rounded bottom and only lower half of wetted perimeter is lined; deals with settlement of canals due to coal mining. (See also - no. 28 June 24 1927 p 406-408)
Lining of open sewers
Auskleidung von offenen Abwasserkanalen
Steckhan, D. (author)
Bautechnik ; 5
1927
4 pages
15 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Lining of sewers in "Rural Paris"
Online Contents | 1994
|Replacing existing, non-accessible Sewers in the same Level (Crush-Lining)
British Library Conference Proceedings | 1994
|Replacing existing, non-accessible Sewers in the same Level (Crush-Lining)
Online Contents | 1994
|Undergorund replacement of non-man-entry sewers with the "Crush-Lining-System"
British Library Conference Proceedings | 1998
|Replacing existing, non-negotiable Sewers underground along the same Route ("Crush Lining")
British Library Conference Proceedings | 1997
|