A platform for research: civil engineering, architecture and urbanism
Construction and maintenance operations during 1926 on 76-mile system of highways; experimental use of cold-mix surface; detailed costs of base course, bituminous top and surface treatment work.
Work on the Ottawa suburban roads
Contract Rec
Hay, A.K. (author)
Contract Record ; 41
1927
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Ottawa suburban roads commission
Engineering Index Backfile | 1929
|Maintenance on Ottawa suburban roads
Engineering Index Backfile | 1943
|Maintenance costs on Ottawa suburban roads
Engineering Index Backfile | 1937
|Bituminous-treatment unit costs on Ottawa suburban roads
Engineering Index Backfile | 1945
|Maintenance operations and costs on Ottawa suburban roads
Engineering Index Backfile | 1934
|