A platform for research: civil engineering, architecture and urbanism
By diverting Schuylkill River through artificial channel, leading railroad eliminates long tunnel and two river crossings.
By diverting Schuylkill River through artificial channel, leading railroad eliminates long tunnel and two river crossings.
Railroad changes river's course
Sci. Am
Walker, J.B. (author)
Scientific American ; 136
1927
2 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
DSpace@MIT | 1998
|River's Centerline Defines Land Rights
Wiley | 2001
Ohio River's new stairway to Pittsburgh
Engineering Index Backfile | 1961
|The Elizabeth River's New Immersed Tube Tunnel
ASCE | 2022
|‘Scavenger’ Boat Helps Restore Miami River's Health
Wiley | 2006
|