A platform for research: civil engineering, architecture and urbanism
A new 300 M.G.D. pumping station in Chicago
How William Hale Thompson pumping station was designed and is being built to serve industrial and residential section of 19 sq. mi. as part of modern development of city system.
A new 300 M.G.D. pumping station in Chicago
How William Hale Thompson pumping station was designed and is being built to serve industrial and residential section of 19 sq. mi. as part of modern development of city system.
A new 300 M.G.D. pumping station in Chicago
Water Wks
Water Works ; 66
1927
7 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
East Chicago Pumping Station Failure
Wiley | 1949
|Foundations for the new building and pumps, lake view pumping station, Chicago
Engineering Index Backfile | 1909
The intake tunnel and crib of the Lawrence avenue pumping station, Chicago
Engineering Index Backfile | 1908
Efficiency Maintenance in Chicago Pumping Stations
Wiley | 1942
|Engineering Index Backfile | 1911