Decayed piling replaced with concrete
Old piles cut off below water level and concrete retaining wall with two rows of anchor piles built at total cost of $160 per lineal foot at Acme Plant of Toledo Edison Co.
Decayed piling replaced with concrete
Old piles cut off below water level and concrete retaining wall with two rows of anchor piles built at total cost of $160 per lineal foot at Acme Plant of Toledo Edison Co.
Decayed piling replaced with concrete
Power Plant Eng
Dougherty, S.S. (author)
1927
2 pages
3 Figs.
Article (Journal)
English