A platform for research: civil engineering, architecture and urbanism
Construction of works, as also restoration of Lake Lungern, Switzerland, to its primitive depth, which it retained until 1836, is being carried on in stages; for present there will be a dam 16 m. high and at altitude of 672 m., with useful storage capacity of 17, 000,000 cu. m.; water runs from reservoir to compensation reservoir through tunnel built in 1836; and from compensation reservoir and engine house through two iron mains to Unter As works.
Construction of works, as also restoration of Lake Lungern, Switzerland, to its primitive depth, which it retained until 1836, is being carried on in stages; for present there will be a dam 16 m. high and at altitude of 672 m., with useful storage capacity of 17, 000,000 cu. m.; water runs from reservoir to compensation reservoir through tunnel built in 1836; and from compensation reservoir and engine house through two iron mains to Unter As works.
Hydroelectric installation of Lake Lungern
Instalacion hidroelectrica del lago Lungern
Gelpke, V. (author)
1926
10 pages
21 Figs.
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
Computing hydraulic transients in the Lungern Lake plant
Tema Archive | 1993
|Achen Lake hydroelectric plant
Engineering Index Backfile | 1926
|Hydroelectric plants at lake Schluch
Engineering Index Backfile | 1922
|Blue Lake Hydroelectric Expansion Project-Tunnel Excavations
British Library Conference Proceedings | 2015
|