A platform for research: civil engineering, architecture and urbanism
The heating installation of University College Hospital, London
Steam required for heating amounts to 750 lb. a day during winter period; whole quantity is supplied by 5 Lancashire boilers.
The heating installation of University College Hospital, London
Steam required for heating amounts to 750 lb. a day during winter period; whole quantity is supplied by 5 Lancashire boilers.
The heating installation of University College Hospital, London
Engineering
Engineering ; 124
1927
4 pages
20 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Frames for the future: University College London Hospital
British Library Online Contents | 2003
|Online Contents | 1998
Online Contents | 1997
Online Contents | 1998
CONCRETE FRAME CONSTRUCTION - Frames for the future: University College London Hospital
Online Contents | 2003
|