A platform for research: civil engineering, architecture and urbanism
Heating and ventilating Paramount theater building
Heating and ventilating of building became dual problem, that of heating and ventilating theater and of heating office building; indirect heating and cooling was chosen for theater, while two-pipe vacuum system supplying direct radiation was installed for office portion.
Heating and ventilating Paramount theater building
Heating and ventilating of building became dual problem, that of heating and ventilating theater and of heating office building; indirect heating and cooling was chosen for theater, while two-pipe vacuum system supplying direct radiation was installed for office portion.
Heating and ventilating Paramount theater building
Power
Power ; 66
1927
3 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1950
|Heating and ventilating the New Montauk Theater, Brooklyn, New York
Engineering Index Backfile | 1906
Heating and ventilating plant, equitable building
Engineering Index Backfile | 1916
|Heating and ventilating the Empire State building
Engineering Index Backfile | 1930
|Heating and ventilating a mediumsized school building
Engineering Index Backfile | 1905