A platform for research: civil engineering, architecture and urbanism
Plain concrete lining and reinforced-concrete rings feature shaft construction in No. 5 and No. 6 main shafts and in new air raise nearing completion. See also Min. Congress Jl., vol. 13, no. 4, Apr. 1927, pp. 305-306 and 314, 3 figs.
Plain concrete lining and reinforced-concrete rings feature shaft construction in No. 5 and No. 6 main shafts and in new air raise nearing completion. See also Min. Congress Jl., vol. 13, no. 4, Apr. 1927, pp. 305-306 and 314, 3 figs.
Shaft construction methods at United Verde
Ariz. Min. JI
Flood, W.J. (author)
1927
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Underground ore-bin construction at the united verde
Engineering Index Backfile | 1926
|Online Contents | 1996
|Ventilation problems at the united verde mine
Engineering Index Backfile | 1927
|Mining methods and practices at United Verde Copper Mines, Jerome, Ariz
Engineering Index Backfile | 1931
|