A platform for research: civil engineering, architecture and urbanism
Unique mixing plant on midwest project
Excavating with draglines, handling bulk cement, conveying aggregates by belt conveyors, handling mixed concrete by belt conveyors, handling 7-yd. batches with cableway, and other unusual features utilized in building sewage-disposal plant in Chicago.
Unique mixing plant on midwest project
Excavating with draglines, handling bulk cement, conveying aggregates by belt conveyors, handling mixed concrete by belt conveyors, handling 7-yd. batches with cableway, and other unusual features utilized in building sewage-disposal plant in Chicago.
Unique mixing plant on midwest project
Eng. Contracting
1927
6 pages
14 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Extended-reach placing booms expedite Midwest bridge project
British Library Online Contents | 1995
Stormwater and Prairie Plant Performance of Midwest Green Roofs
British Library Conference Proceedings | 2004
|Engineering Index Backfile | 1948
|TIBKAT | 2019
|SPECIAL REPORT: THE MIDWEST - MARKET OVERVIEW - Midwest meets demands for sewers
Online Contents | 2012