A platform for research: civil engineering, architecture and urbanism
Construction features of hotel London
Eight-story and basement structure of reinforced concrete built in nine months without any interruption because of winter weather.
Construction features of hotel London
Eight-story and basement structure of reinforced concrete built in nine months without any interruption because of winter weather.
Construction features of hotel London
Contract Rec. Eng. Rev
1927
6 pages
13 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1975
|Detail | 2019
|British Library Online Contents | 2004
|British Library Online Contents | 2000