A platform for research: civil engineering, architecture and urbanism
Superstructures of the reinforced-concrete bridge near gartz on the oder river
Details of superstructure of new bridge which collapsed on Sept. 19, 1926; investigations and tests; application of cast concrete; high-grade cement and steel, known as Baustahl 48, were employed.
Superstructures of the reinforced-concrete bridge near gartz on the oder river
Details of superstructure of new bridge which collapsed on Sept. 19, 1926; investigations and tests; application of cast concrete; high-grade cement and steel, known as Baustahl 48, were employed.
Superstructures of the reinforced-concrete bridge near gartz on the oder river
Die Ueberbauten der Eisenbetonbruke bei Gartz an der Oder
Habicht, F.R. (author)
Bauingenieur ; 8
1927
8 pages
17 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
The collapse of the bridge near gartz on the oder river
Engineering Index Backfile | 1926
|Bridge failure at gartz on the oder
Engineering Index Backfile | 1931
|Bridge Failure at Gartz on the Oder
Engineering Index Backfile | 1930
|Bridge failure at gartz on the oder
Engineering Index Backfile | 1930
|