A platform for research: civil engineering, architecture and urbanism
Brief description of design of new bridge over Sieg river, about 117 m. long, consisting of four 3-hinge concrete arches, 15 to 30 m. in span; details of unprecedented flood of December 1925 which destroyed left abutment and 25 m. arch of still uncompleted bridge; analysis of failure and methods of reconstruction; also data on construction of three-hinge concrete bridge, 70 m. clear span and bridge of 3 three-hinge semi-circular bridge arches, of 15 m. spans over Wahnbach.
Brief description of design of new bridge over Sieg river, about 117 m. long, consisting of four 3-hinge concrete arches, 15 to 30 m. in span; details of unprecedented flood of December 1925 which destroyed left abutment and 25 m. arch of still uncompleted bridge; analysis of failure and methods of reconstruction; also data on construction of three-hinge concrete bridge, 70 m. clear span and bridge of 3 three-hinge semi-circular bridge arches, of 15 m. spans over Wahnbach.
Allner bridge at siegburg Wahnbach bridges
Mitteilungen uber die Allnerbrucke bei Siegburg und Erganzungen ueber die Wahnbachtalbr ucken
Schmidt, B. (author)
Bauingenieur ; 8
1927
8 pages
20 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.