A platform for research: civil engineering, architecture and urbanism
Trussed arch bridge, built in 1878, of three spans, 65 m. each, required strengthening of abutments, piers, and arches; construction, layout and methods described. (See also - no. 16 Apr. 8 1927 pp. 235-239)
Trussed arch bridge, built in 1878, of three spans, 65 m. each, required strengthening of abutments, piers, and arches; construction, layout and methods described. (See also - no. 16 Apr. 8 1927 pp. 235-239)
Strengthening the railroad bridge over the mosel at Guls
Der Umbau der Eisenbahnbrucke uber die mosel bei Guls
Jacobi (author)
Bautechnik ; 5
1927
5 pages
23 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of double track railroad bridge over Mosel River, near Eller, Germany
Engineering Index Backfile | 1957
|