A platform for research: civil engineering, architecture and urbanism
Erecting long bridge spans over Niagara river
Superstructure work of Buffalo-Fort Erie bridge handled with help of ingenious system of removable steel spud cribs as falsework supports; entire erection carried out in one season.
Erecting long bridge spans over Niagara river
Superstructure work of Buffalo-Fort Erie bridge handled with help of ingenious system of removable steel spud cribs as falsework supports; entire erection carried out in one season.
Erecting long bridge spans over Niagara river
Eng. News-Rec
1927
5 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Erecting the end spans of the new east river bridge
Engineering Index Backfile | 1901
Falsework for erecting the manhattan towers and end spans, new east river bridge
Engineering Index Backfile | 1900
|Erecting bridge spans by sliding them forward from the shore
Engineering Index Backfile | 1904
Old spans used in erecting Illinois first all-welded Girder bridge
Engineering Index Backfile | 1957
|Long continuous truss bridge spans Mississippi River
Engineering Index Backfile | 1936
|