A platform for research: civil engineering, architecture and urbanism
Earth-resistivity tests applied as rapid,nondestructive procedure for determining thickness of concrete pavements
Test involves measuring resistance to passage of electric current through selected medium; test is made by using four electrodes equally spaced in line on surface of material being tested; when testing concrete pavement electrode system may be spaced at 1- or 2-in. spacing for initial readings of current and potential change, and system expanded in 1-in. increments for successive readings extending to total depth of 3 to 6 in. below bottom of pavement.
Earth-resistivity tests applied as rapid,nondestructive procedure for determining thickness of concrete pavements
Test involves measuring resistance to passage of electric current through selected medium; test is made by using four electrodes equally spaced in line on surface of material being tested; when testing concrete pavement electrode system may be spaced at 1- or 2-in. spacing for initial readings of current and potential change, and system expanded in 1-in. increments for successive readings extending to total depth of 3 to 6 in. below bottom of pavement.
Earth-resistivity tests applied as rapid,nondestructive procedure for determining thickness of concrete pavements
Nat Research Council -- Highway Research Board -- Research Rec
Moore, R.W. (author)
1968
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Nondestructive thickness tests for highway pavements
Engineering Index Backfile | 1963
|Nondestructive Tests of Thickness Measurements for Concrete Pavements: Tests Really Work
British Library Online Contents | 2012
|Reliability-based Thickness Design Procedure of Concrete Pavements
British Library Conference Proceedings | 1995
|Determining required thickness of concrete pavements for highways
Engineering Index Backfile | 1955
|Use of Nondestructive Testing for Concrete Pavements
British Library Conference Proceedings | 2001
|