A platform for research: civil engineering, architecture and urbanism
Asutsuare irrigation scheme, Ghana -- Planning and design
Regulation and partial control of Volta River by Akosombo Dam for development of Lower Volta Flood Plain; United Nations Special Fund project study led to selection of Asutsuare Scheme for detailed engineering investigation and design; background to development of area, and hydrological conditions are described; physical, and engineering problems associated with design of irrigation, drainage and roadworks for Asutsuare Scheme; irrigation water is to be supplied by pumping from Volta River, eventually using electric power generated at Akosombo.
Asutsuare irrigation scheme, Ghana -- Planning and design
Regulation and partial control of Volta River by Akosombo Dam for development of Lower Volta Flood Plain; United Nations Special Fund project study led to selection of Asutsuare Scheme for detailed engineering investigation and design; background to development of area, and hydrological conditions are described; physical, and engineering problems associated with design of irrigation, drainage and roadworks for Asutsuare Scheme; irrigation water is to be supplied by pumping from Volta River, eventually using electric power generated at Akosombo.
Asutsuare irrigation scheme, Ghana -- Planning and design
Instn Civ Engrs -- Proc
Stern, P.H. (author)
1968
22 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Planning for Sustainable Agriculture in Ghana Using Tank Irrigation
British Library Online Contents | 2001
|British Library Conference Proceedings | 1993
|Decentralizing regional planning in Ghana
TIBKAT | 1985
|Groundwater potential for dry-season irrigation in north-eastern Ghana
Taylor & Francis Verlag | 2013
|