A platform for research: civil engineering, architecture and urbanism
Justifying expenditures for grade reductions
Shows that the construction of the Clarks Summit-Hallstead line is fully warranted by operating results. (Abstract.) Paper read before Western Soc. Engrs.
Justifying expenditures for grade reductions
Shows that the construction of the Clarks Summit-Hallstead line is fully warranted by operating results. (Abstract.) Paper read before Western Soc. Engrs.
Justifying expenditures for grade reductions
Ry. Age
Ray, George J. (author)
Railway Age ; 71
1921
8 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1998
Justifying Intelligent Controls in Intelligent Buildings
British Library Conference Proceedings | 1998
|JUSTIFYING APPARATUS PURCHASES: A NECESSARY EVIL
British Library Online Contents | 2000
|PROJECT CONDITIONS JUSTIFYING TIME-AT-LARGE CLAIMS
TIBKAT | 2020
|