A platform for research: civil engineering, architecture and urbanism
Ultimate development on Winnipeg River of 168,000 hp. planned; power house being built for initial installation of three 28,000-hp. units; operating head 56 ft.; maximum height dam 70 ft.; concrete centercone draft tubes.
Ultimate development on Winnipeg River of 168,000 hp. planned; power house being built for initial installation of three 28,000-hp. units; operating head 56 ft.; maximum height dam 70 ft.; concrete centercone draft tubes.
Great Falls development of Manitoba Power Co.
Can. Engr
Martin, H. (author)
Canadian Engineer ; 43
1922
5 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Black Eagle Falls Dam Great Falls, Montana
ASCE | 2021
|Demolition of Cofferdams below Great Falls power development on Winnipeg river
Engineering Index Backfile | 1923
Online Contents | 2013
Engineering Index Backfile | 1957
|Power development at Chats Falls
Engineering Index Backfile | 1931