A platform for research: civil engineering, architecture and urbanism
Pine hill dam
Foundations 62 ft. deep built in 10 sections with iron stop plates in const over-bar ruction joints. Water cushion formed by weir. Part of main dam built in narrow long sections temporarily serving as cofferdams.
Pine hill dam
Foundations 62 ft. deep built in 10 sections with iron stop plates in const over-bar ruction joints. Water cushion formed by weir. Part of main dam built in narrow long sections temporarily serving as cofferdams.
Pine hill dam
Public Works
Public Works ; 52
1922
3 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1916
|Pine Hill Tank Weld Seam Failure Forensic Investigation
British Library Conference Proceedings | 2018
|Hill to hill bridge, Bethlehem, Pa
Engineering Index Backfile | 1924
Online Contents | 1997
British Library Online Contents | 2002
|