A platform for research: civil engineering, architecture and urbanism
Features of Camarasa hydroelectric development in Cataluna, Spain. Built at high speed under war conditions. Dam 333 ft. high with gravity section of sand-cement concrete.
Features of Camarasa hydroelectric development in Cataluna, Spain. Built at high speed under war conditions. Dam 333 ft. high with gravity section of sand-cement concrete.
Building the highest dam in Europe
Eng. News-Rec
Ranney, Willis (author)
1922
8 pages
9 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
At work on the highest building in Europe
Online Contents | 2007
|At work on the highest building in Europe
British Library Online Contents | 2007
|Engineering Index Backfile | 1903
Building the highest hydraulic fill dam
Engineering Index Backfile | 1924
|Reclamation service building highest earth dam
Engineering Index Backfile | 1921
|