A platform for research: civil engineering, architecture and urbanism
Novel headgear at a Cape Breton colliery
Discusses new surface plant now in construction, including two electrically driven hoisting engines, a structural steel headframe 90 ft. high, a steel and concrete bankhead, an auxiliary dump building, and a main dump screen and picking-belt building provided with the necessary machines, electric motors, etc.
Novel headgear at a Cape Breton colliery
Discusses new surface plant now in construction, including two electrically driven hoisting engines, a structural steel headframe 90 ft. high, a steel and concrete bankhead, an auxiliary dump building, and a main dump screen and picking-belt building provided with the necessary machines, electric motors, etc.
Novel headgear at a Cape Breton colliery
Colliery Guardian
Colliery Guardian ; 122
1921
2 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cementation of shaft in Cape Breton colliery
Engineering Index Backfile | 1929
|University College of Cape Breton
British Library Conference Proceedings | 1994
|Gypsum on Cape Breton Island, Nova Scotia
Engineering Index Backfile | 1909
|Some problems of longwall mining in Cape Breton
Engineering Index Backfile | 1947
|Water problems in Cape Breton coal mining districts
Engineering Index Backfile | 1934
|