A platform for research: civil engineering, architecture and urbanism
Continuous-traffic lift bridges proposed for Allegheny river at Pittsburgh
Superstructure of proposed bridge would be placed 33 ft. above ordinary stage of water, known as pool-full stage. (See also - discussion p 241-265)
Continuous-traffic lift bridges proposed for Allegheny river at Pittsburgh
Superstructure of proposed bridge would be placed 33 ft. above ordinary stage of water, known as pool-full stage. (See also - discussion p 241-265)
Continuous-traffic lift bridges proposed for Allegheny river at Pittsburgh
Engrs.' Soc. West. Pa., Proc
Henderson, A.A. (author)
1922
14 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Allegheny Riverfront Park, Pittsburgh
British Library Online Contents | 2000
|Allegheny Commons in Pittsburgh, USA
Online Contents | 1975
|Landmark architecture : Pittsburgh and Allegheny County
TIBKAT | 1985
|Approaches to north side point bridge over allegheny river at Pittsburgh
Engineering Index Backfile | 1914
Three new Allegheny River bridges to be of unusual type
Engineering Index Backfile | 1924